alconstruction964@gmail.com+1 647 339 19913360 Council Ring Road, Mississauga, Ontario
Request an EstimateLog in
Renovation

Marble Kitchen Renovation

A full marble waterfall island kitchen transformation blending warm wood tones with polished stone.

15 Years of ExperienceSkilled Local TeamResidential & Commercial
4 wksOn-site duration
The problem

The problem

The original kitchen had a closed galley layout, dated laminate counters and a peninsula that blocked the only path to the dining room. Storage was short, the lighting was flat and the family avoided cooking together because two people could not pass each other at the sink.

  • Closed layout with a peninsula blocking circulation
  • Worn laminate counters and failing cabinet hinges
  • Single ceiling fixture, no task lighting at the counter
The process

How we delivered this project

Every stage was agreed in writing before work started, so the homeowner always knew what happened next.

Kitchen renovation site review
01

Site review & scope

We inspected the space, measured, and documented existing conditions before pricing anything.

Finished kitchen renovation
02

Proposal & sign-off

A written scope, material list, schedule and fixed price — approved before demolition began.

Marble kitchen detail
03

Build & coordination

Our trades worked in sequence under one project lead, with the site cleaned at the end of each day.

Marble kitchen island
04

Walkthrough & handover

We reviewed the finished work together and closed out every deficiency before final invoicing.

The kitchen now works for two cooks at once. The peninsula is gone, replaced by a marble waterfall island that seats four and doubles the usable prep surface, and the run to the dining room is clear.

Layered lighting — ceiling, under-cabinet and island pendants — means the room is as usable at seven in the morning as it is at dinner. The family cooks together again, which was the point.

The Result
4 wksOn-site duration
2xUsable counter space
100%On-budget delivery
Marble waterfall island kitchen
Still have questions?Get in touch
Frequently Asked Questions

Questions about this project

Four weeks on site, from demolition to the final walkthrough, including cabinetry, stone, electrical and finishing.

Yes. We set up a temporary prep area, sealed the work zone with dust barriers and cleaned the site at the end of each day.

We coordinated the slab selection with the homeowner at the stone yard, then handled templating, fabrication and installation.

Yes. The same open-island approach scales down; we size the island to keep at least a one-metre walkway on every side.

Planning something similar?

Tell us about your space and our team will follow up to confirm scope, timeline and pricing.

Request a Free Estimate