alconstruction964@gmail.com+1 647 339 19913360 Council Ring Road, Mississauga, Ontario
Request an EstimateLog in
Renovation

Home Entrance Makeover

A complete entryway overhaul - from a dated foyer to a striking first impression.

15 Years of ExperienceSkilled Local TeamResidential & Commercial
9 daysOn-site duration
The problem

The problem

The entry was the first thing guests saw and the last thing the owners wanted them to see: scuffed baseboards, a cramped coat area and worn tile that had been patched twice. Winter boots and bags had nowhere to go, so the hallway stayed cluttered year-round.

  • Patched, uneven tile at the highest-traffic point in the home
  • No dedicated storage for coats, boots or bags
  • Damaged trim and scuffed walls from daily traffic
The process

How we delivered this project

Every stage was agreed in writing before work started, so the homeowner always knew what happened next.

Kitchen renovation site review
01

Site review & scope

We inspected the space, measured, and documented existing conditions before pricing anything.

Finished kitchen renovation
02

Proposal & sign-off

A written scope, material list, schedule and fixed price — approved before demolition began.

Marble kitchen detail
03

Build & coordination

Our trades worked in sequence under one project lead, with the site cleaned at the end of each day.

Marble kitchen island
04

Walkthrough & handover

We reviewed the finished work together and closed out every deficiency before final invoicing.

The entry now does its job. A built-in bench with six storage positions keeps coats, boots and bags off the floor, and slip-resistant porcelain tile handles winter salt without patching.

The family kept using their front door through all but one day of the build, and the hallway has stayed clear since.

The Result
9 daysOn-site duration
6Storage positions
1 dayDowntime
Home entrance after renovation
Still have questions?Get in touch
Frequently Asked Questions

Questions about this project

Except for one day of tile setting and curing, yes. We staged the work so the entry stayed passable.

Yes. We used a porcelain tile with a slip-resistant rating and a sealed grout that handles road salt.

The bench and upper cabinets were built on site to fit the exact wall dimensions, then painted to match the trim.

Planning something similar?

Tell us about your space and our team will follow up to confirm scope, timeline and pricing.

Request a Free Estimate